We re-plan only what breaks.

A four-leg chain — truck, train, barge, last-mile truck. When low water hits the Waal, the optimiser swaps only the barge leg to rail. The rest of the chain stays untouched, and you stay on time.

Scanning orders & network
Four-leg multimodal chain from origin to customer A left-to-right chain of five nodes: origin, drayage by truck to a rail terminal, long-haul by train to an inland port, inland waterway by barge to a cross-dock, and last-mile truck to the customer. When the barge leg is disrupted by low water on the Waal, only that leg is re-routed to rail; the truck, train and last-mile legs stay highlighted in teal. TRUCK TRAIN BARGE RAIL TRUCK UNTOUCHED UNTOUCHED UNTOUCHED ORIGIN Shipper DC Rail terminal Load to train drayage in Inland port River quay on the Waal Cross-dock Transhipment to last-mile DELIVER Customer Low water on the Waal
Cost
€1,460
best price
CO₂
84 kg
low-emission
Lead time
41 h
planned
On-time
On time
+24% vs manual
Scanning incoming container orders against the live four-leg network.Truck drayage, long-haul rail, inland barge and last-mile truck — all considered at once.
Continuous optimisation

We re-plan only what breaks.

A four-leg chain. When the waterway fails, the optimiser swaps only the barge leg to rail — the other three legs stay exactly as planned, and you stay on time.

Phase 1 · Optimal plan

Barge-led chain

The optimiser selects the best four-leg route — lowest cost and emissions, comfortably on time.

trucktrainbargetruck
Cost €1,460 CO₂ 84 kg Lead 41 h On time
Phase 3 · Re-optimised in 2s

Only the barge leg swapped

Low water on the Waal breaks the barge leg. The system swaps only that segment to rail and leaves truck, train and last-mile untouched. Slightly pricier and a touch more CO₂ — but still on time. Resilience, not a free re-route.

trucktrainbarge railtruck
Cost €1,590 CO₂ 99 kg Lead 40 h On time

Waypoint Netherlands re-optimises only the affected leg, leaving the rest of the chain in place — so disruption stays contained and you keep running the best plan. KPI figures above are illustrative placeholders.

Honest by design: swapping the barge leg to rail is slightly pricier and a touch higher-CO₂ than the original plan — the win is that only one leg changes and you stay on time when the waterway fails. KPI figures are illustrative placeholders.